Infrastructure · Cost Optimisation
The New-Branch IT Blueprint
A repeatable IT design for opening new hospital and diagnostic branches faster and cheaper, with standard network, hardware and systems from day one.
- 30%IT cost savings in new branches
- 18%lower annual IT operating cost
As the network grew to 27 branches, every opening risked becoming a one-off IT project with its own vendors, designs and surprises.
The challenge
- New branches were costly to equip and slow to bring online.
- Non-standard designs made support harder and drove up long-term costs.
The approach
I turned branch IT into a repeatable blueprint:
- Standard reference design for network, Wi-Fi, end-user hardware and connections to central systems.
- Consolidated purchasing and renegotiated vendor contracts to use the network’s scale.
- Energy-efficient, consolidated infrastructure to cut running costs as well as set-up costs.
- Documented SOPs so any team could deploy and support a branch the same way.
The outcome
- 30% IT cost savings in newly opened branches.
- 18% lower annual IT operating costs through vendor renegotiation, infrastructure consolidation and energy-efficient solutions.
- Recognised with the Cost Optimization Award (2021).